Skip to content

Operation Sunstorm

  • by

This friday and saturday were on the agenda to resolve the mysterie of the problems we encountered with our recently installed 10m and 20m yagis. Not knowing it would be two of the hottest days in the Dutch summier everything was prepare and Friday the preparation work started. Based on that experience the program was rescheduled tot start the net… Read More »Operation Sunstorm

Friday… repair day

  • by

Today the moment was there to repair the 20m Optibeam from the damage encountered during the 3 storms which hit us within a 2 week periode. We quickly received the damaged parts from Tom at Optibeam maling it possible to do the repair work today. Luckely the weather was very fine for antenna work so all went well and the… Read More »Friday… repair day