Skip to content

PI4COM

Preparation Day

  • by

Friday, August 20 a small crew consisting of Kees PA3BWD, Ronald PA3EWP and Ton PA1CC gathered at the station to do the last preparation work for the planned antenna work on Saturday. Murphy was also present so a lot of time was lost as the top section got stuck when lowering the tower. 3 hours of valuable time lost so… Read More »Preparation Day

A BIG step forward

  • by

Yesterday a small group of members did a lot of preparation work for the new 20m yagi. Under the inspiring leadership of Kees PA3BWD, Ronald PA3EWP, Ton PA1CC and Derk PD9DX have installed the rotor. To do this, major adjustments to the mast construction were required. Thanks to the preparatory work of Kees PA3BWD everything went well and after a… Read More »A BIG step forward